↑ Return to Rural Supply

Print this Page

Supervising and Implementation of the Pilot Irrigation Projects

Engineers of the Rural Supply Unit study the pilot irrigation projects and supervise their implementation within the geographic area of irrigation projects related to the Litani River Authority. The examining and rehabilitation of the irrigation systems within the pilot project for eastern Sidon destroyed in the war have been completed. Irrigation channels were set up to the following villages: Ain Al Delb, Miyeh w Miyeh, Ain el Mir, and Abra al Qadimeh, to irrigate an overall area of 1250 dunams.

The Authority is also preparing the Terms of Reference to contract third parties. Recently, terms of reference were prepared for contracting third parties to upgrade the study led by Kredo 2003 on setting up artesian irrigation systems in Mashgara, Suhmur and Majdal Balheis.

Permanent link to this article: http://www.litani.gov.lb/en/?page_id=141