↑ Return to Cooperation Projects

Print this Page

Litani River Basin Management Support (LRBMS)

Project Reports

 

Reports Reports Reports
001-LRBMS-FEASIBILITY STUDY FOR CONSTRUCTED WETLANDS IN THE LITANI RIVER BASIN 002 – THE ROLE OF THE LITANI RIVER AUTHORITY  003-LRBMS-AN ECONOMIC ASSESSMENT OF WATER USE AND WATER POLLUTION IN THE LITANI RIVER BASIN
Reports Reports Reports
 004-LRBMS-VOLUME 1 PROBLEMS AND ACTON PLAN- ENGLISH  005-LRBMS-VOLUME 1 PROBLEMS AND SOLUTIONS- ARABIC  006-LRBMS-RESTRUCTURING THE LITANI RIVER AUTHORITY
Reports Reports Reports
 007-LRBMS-LITANI RIVER FLOOD MANAGEMENT REPORT  008-LRBMS-FLOOD MANAGEMENT REPORT- ARABIC  009-LRBMS-FLOOD MANAGEMENT REPORT- ENGLISH
Reports Reports Reports
 010-LRBMS-MANAGEMENT PLAN VOL 2 ACTION PLAN-ARABIC  011-LRBMS-MANAGEMENT PLAN VOL 2 ACTION PLAN- ENGLISH  012-LRBSM-LITANI RIVER FLOOD FIELD SURVEY REPORT
Reports Reports Reports
 013-LRBMS-HYDROGEOLOGIC REFERENCE REPORT  014-LRBMS-LITANI RIVER CONSTRUCTED TREATMENT WETLAND 015-LRBMS-WATER BALANCE
Reports Reports Reports
 016-LRBMS-ACTION PLAN FOR WATER RESOURCES AWARENESS AND ENFORCEMENT  017-LRBMS-ESTABLISHMENT OF A WATER FEDERATION OF MUNICIPALITIES  018-LRBMS-GROUNDWATER MODELING WITHIN THE UPPER LITANI BASIN
Reports Reports Reports
 019-LRBMS-LAND USE AND CROP CLASSIFICATION ANALYSIS FOR THE UPPER LITANI RIVER BASIN 020-LRBMS-DEMONSTRATION DRIP IRRIGATION SYSTEMS 021-LRBMS-EXPANSION OF THE GROUNDWATER MONITORING NETWORK IN THE UPPER LITANI BASIN
Reports Reports Reports
 022-LRBMS-CONSTRUCTION OF MACHGHARA PLAIN IRRIGATION PIPE-DESIGN REPORT  023-LRBMS-MODELING OF NEW GRAVITY DIVERSIONS FOR CANAL 900 NETWORK  024-LRBMS-WATER QUALITY DATABASE MANAGEMENT
Reports Reports Reports
 025-LRBMS-WATER QUALITY INDEX  026-LRBMS-WATER POLLUTION AWARENESS CAMPAIGN 027-LRBMS-SET-UP OF SURFACE AND GROUNDWATER MONITORING SYSTEM WITHIN THE UPPER LITANI BASIN
Reports Reports Reports
 028-LRBMS-SEISMIC DEFORMATION ANALYSIS OF QARAOUN  029-LRBMS-SUPPORT TO COLLABORATIVE ACTIVITIES  030-LRBMS-ROVER TRAINING AND DAM INSPECTION
Reports Reports Reports
 031-LRBMS-DAM BREAK MODELING FOR QARAOUN DAM VOL 1  032-LRBMS-DAM BREAK MODELING FOR QARAOUN DAM VOL 2  033-LRBMS-DAM INSTRUMENTATION EVALUATION AND RECOMMENDATIONS
Reports Reports Reports
 034-LRBMS-DAM SAFETY AND MONITORING PLAN  035-LRBMS-EMERGENCY ACTION PLAN FOR QARAOUN DAM  036-LRBMS-EMERGENCY ACTION PLAN FOR QARAOUN DAM – ARABIC
Reports Reports Reports
 037-LRBMS-KNOWLEDGE ASSESSMENT SURVEY  038-LRBMS-LEAKAGE DETECTION SURVEY  039-LRBMS-LITANI RIVER WALK – THROUGH SURVEY REPORT- ENGLISH
Reports Reports Reports
 040-LRBMS-LITANI RIVER WALK – THROUGH SURVEY REPORT- ARABIC  041-LRBMS-QARAOUN RESERVOIR BATHYMETRIC SURVEY  042-LRBMS-FARMER SATISFACTION SURVEY 2010
Reports Reports Reports
 043-LRBMS-FARMER SATISFACTION SURVEY 2011  044-LRBMS-FARMER SATISFACTION SURVEY 2012  045-LRBMS-FARMER SATISFACTION SURVEY 2013
Reports Reports Reports
 046-LRBMS-WATER QUALITY SURVEY – WET SEASON  047-LRBMS-WATER QUALITY SURVEY – DRY SEASON  048-LRBMS-WATER QUALITY SURVEY – DRY SEASON VOL 2

Permanent link to this article: http://www.litani.gov.lb/en/?page_id=166