 |
 |
 |
001-LRBMS-FEASIBILITY STUDY FOR CONSTRUCTED WETLANDS IN THE LITANI RIVER BASIN |
002 – THE ROLE OF THE LITANI RIVER AUTHORITY |
003-LRBMS-AN ECONOMIC ASSESSMENT OF WATER USE AND WATER POLLUTION IN THE LITANI RIVER BASIN |
|
|
|
 |
 |
 |
004-LRBMS-VOLUME 1 PROBLEMS AND ACTON PLAN- ENGLISH |
005-LRBMS-VOLUME 1 PROBLEMS AND SOLUTIONS- ARABIC |
006-LRBMS-RESTRUCTURING THE LITANI RIVER AUTHORITY |
|
|
|
 |
 |
 |
007-LRBMS-LITANI RIVER FLOOD MANAGEMENT REPORT |
008-LRBMS-FLOOD MANAGEMENT REPORT- ARABIC |
009-LRBMS-FLOOD MANAGEMENT REPORT- ENGLISH |
|
|
|
 |
 |
 |
010-LRBMS-MANAGEMENT PLAN VOL 2 ACTION PLAN-ARABIC |
011-LRBMS-MANAGEMENT PLAN VOL 2 ACTION PLAN- ENGLISH |
012-LRBSM-LITANI RIVER FLOOD FIELD SURVEY REPORT |
|
|
|
 |
 |
 |
013-LRBMS-HYDROGEOLOGIC REFERENCE REPORT |
014-LRBMS-LITANI RIVER CONSTRUCTED TREATMENT WETLAND |
015-LRBMS-WATER BALANCE |
|
|
|
 |
 |
 |
016-LRBMS-ACTION PLAN FOR WATER RESOURCES AWARENESS AND ENFORCEMENT |
017-LRBMS-ESTABLISHMENT OF A WATER FEDERATION OF MUNICIPALITIES |
018-LRBMS-GROUNDWATER MODELING WITHIN THE UPPER LITANI BASIN |
|
|
|
 |
 |
 |
019-LRBMS-LAND USE AND CROP CLASSIFICATION ANALYSIS FOR THE UPPER LITANI RIVER BASIN |
020-LRBMS-DEMONSTRATION DRIP IRRIGATION SYSTEMS |
021-LRBMS-EXPANSION OF THE GROUNDWATER MONITORING NETWORK IN THE UPPER LITANI BASIN |
|
|
|
 |
 |
 |
022-LRBMS-CONSTRUCTION OF MACHGHARA PLAIN IRRIGATION PIPE-DESIGN REPORT |
023-LRBMS-MODELING OF NEW GRAVITY DIVERSIONS FOR CANAL 900 NETWORK |
024-LRBMS-WATER QUALITY DATABASE MANAGEMENT |
|
|
|
 |
 |
 |
025-LRBMS-WATER QUALITY INDEX |
026-LRBMS-WATER POLLUTION AWARENESS CAMPAIGN |
027-LRBMS-SET-UP OF SURFACE AND GROUNDWATER MONITORING SYSTEM WITHIN THE UPPER LITANI BASIN |
|
|
|
 |
 |
 |
028-LRBMS-SEISMIC DEFORMATION ANALYSIS OF QARAOUN |
029-LRBMS-SUPPORT TO COLLABORATIVE ACTIVITIES |
030-LRBMS-ROVER TRAINING AND DAM INSPECTION |
|
|
|
 |
 |
 |
031-LRBMS-DAM BREAK MODELING FOR QARAOUN DAM VOL 1 |
032-LRBMS-DAM BREAK MODELING FOR QARAOUN DAM VOL 2 |
033-LRBMS-DAM INSTRUMENTATION EVALUATION AND RECOMMENDATIONS |
|
|
|
 |
 |
 |
034-LRBMS-DAM SAFETY AND MONITORING PLAN |
035-LRBMS-EMERGENCY ACTION PLAN FOR QARAOUN DAM |
036-LRBMS-EMERGENCY ACTION PLAN FOR QARAOUN DAM – ARABIC |
|
|
|
 |
 |
 |
037-LRBMS-KNOWLEDGE ASSESSMENT SURVEY |
038-LRBMS-LEAKAGE DETECTION SURVEY |
039-LRBMS-LITANI RIVER WALK – THROUGH SURVEY REPORT- ENGLISH |
|
|
|
 |
 |
 |
040-LRBMS-LITANI RIVER WALK – THROUGH SURVEY REPORT- ARABIC |
041-LRBMS-QARAOUN RESERVOIR BATHYMETRIC SURVEY |
042-LRBMS-FARMER SATISFACTION SURVEY 2010 |
|
|
|
 |
 |
 |
043-LRBMS-FARMER SATISFACTION SURVEY 2011 |
044-LRBMS-FARMER SATISFACTION SURVEY 2012 |
045-LRBMS-FARMER SATISFACTION SURVEY 2013 |
|
|
|
 |
 |
 |
046-LRBMS-WATER QUALITY SURVEY – WET SEASON |
047-LRBMS-WATER QUALITY SURVEY – DRY SEASON |
048-LRBMS-WATER QUALITY SURVEY – DRY SEASON VOL 2 |